is 2 6909781 - 1
has 2080052 decimal digits
takes 1.507 GHz-days to do one PRP test
Last-known PrimeNet details:
Exponent is not assigned to anyone
0 primality tests remaining
ResidueStatus
L-LB2E3703E7B092C6Edouble-checked
PRP-unknown--unknown-

 Trial FactoringP-1 FactoringCombined
LimitGHz-daysProbabilityB1B2GHz-daysProbabilityGHz-daysProbability
Actual272138.402968.0556%1000000300000000.81574.5584%139.218669.5117%
Target2674.300365.6716%450009000000.02902.2357%4.329266.4391%
Difference+5+134.1026+2.3839%+955000+29100000+0.7868+2.3226%+134.8894+3.0726%

Known prime factors:
No known factors for M6909781

P-1 results:
 GHz-DaysworthFactor
probability
dateuseridcompidb1b2estagefactordigitsbits*spentsaved
2009-06-10Roman MaznichenkoWorkShop850001572500---0.052--1.581%
2019-05-09takahashivaio30000050000006---0.176--2.681%
2021-05-15takahashivaio10000003000000012---0.816--4.558%


Trial Factoring results:
 BitsFactorGHz-Daysworth
dateuseridcompidfromtofactorbits*digitsspentsaved
1998-06-29ANONYMOUSv4_computers21262--0.089--
2004-06-12Sturle Sundev4_computers21263--0.231--
2004-08-04Sturle Sundev4_computers21263--0.231--
2014-02-09NesowaManual testing263264--0.284--
2014-02-18lycornManual testing264265--0.541--
2015-06-26VictordeHollanderManual testing265266--1.081--
2016-04-01Gordon SpenceManual testing266267--2.163--
2018-02-25-Anonymous-Manual testing267268--4.326--
2019-12-13mnd9Manual testing268269--8.652--
2020-12-23takahashiManual testing269270--17.30--
2021-08-13SRBaseManual testing270271--34.61--
2021-09-25SRBaseManual testing271272--69.21--


ECM factoring results:
Total ECM effort:1.989 GHz-days
Estimated T-Level:1.154
DigitsB1CompleteFacMiss
20110000.23179.392%
25500000.02197.887%
302500000.00199.865%


ECM Summary

B1B2factorcurvesGHz-days
50000500000061.989


Lucas-Lehmer results:
dateuseridcompidres64spent (GHz-days)
1999-06-06ANONYMOUSv4_computersB2E3703E7B092C6E1.507
2001-09-10ANONYMOUSv4_computersB2E3703E7B092C6E1.507


PRP results:
No PRP results for M6909781


P-1 factor-bounds graph:
B1 = 1000000, B2 = 30000000 (P-1 stage 2)
B1 = 1000000 (P-1 stage 1)
B1 = 300000, B2 = 5000000 (P-1 stage 2)
B1 = 300000 (P-1 stage 1)
B1 = 85000, B2 = 1572500 (P-1 stage 2)
B1 = 85000 (P-1 stage 1)
103
104
105
106
103
104
105
106
107
108
TF factor-bounds graph:
272
271
270
269
268
267
266
265
264
263
262
this exponent TF target: 67
TF double-checked to: 67.8
ECM T-Level=1.15 ~= -13-bit
250
260
270
280
Last modified: 2023-04-26T21:34:10+00:00